| Post a Message | Explore Forums | Browse Stock Messages | Hot Discussions | Top rated Messages | Top Boarders | |
|
|
|
Nagarjuna Construction Co.
Nagar Const - Buy below Rs. 125.
Posted by :
KJPTracked by: 0 Boarder
Nagar Construction can be accumulated at Rs. 125 or below, for long term long term hold....
Nagarjuna Const - ST / MT 150-170 ,sl 115
Posted by :
manukumar05Tracked by: 0 Boarder
Is it good to buy Nagarjuna Const, Is this stock has calaber to reach 150-170 this week....
In reply to:
Nagarjuna Const - ST / MT 150-170+,sl 115
Posted by :
BullSheetRules
Nagarjuna Const:
ST to MT target 150-170+ with SL around 115 with maximum downside around 85 :)
PLAN your GAME accordingly. :)
Gud luk & happy investing! :)
Nagarjuna Const - ST / MT 150-170+,sl 115
Posted by :
BullSheetRulesTracked by: 0 Boarder
Nagarjuna Const:
ST to MT target 150-170+ with SL around 115 with maximum downside around 85 :)
PLAN your GAME accordingly. :)
Gud luk & happy investing! :)...
Ivrcl near term down target=225....
Posted by :
vkk43Tracked by: 0 Boarder
No doubt Nagarjuna Construction around 100/- is a good MT buy....
Ivrcl near term down target=225....
Posted by :
marketmanTracked by: 0 Boarder
Dear sourav,the whole construction sector is in difficult phase due to many reasons.... i will be more bullish with nagarjuna construction at 100 than ivrcl at 225.... ...
Nagarjuna Construction to take up more BOT projects
Posted by :
Silent DonTracked by: 0 Boarder
Excellent informative article. With investor friendly Management, you can expect another bonus in the near future as a tool of capital increase....
In reply to:
Nagarjuna Construction to take up more BOT projects
Posted by :
coolmaddy
At a time when many infrastructure companies are not being aggressive in undertaking build, operate and transfer (BOT) projects in the light of rising interest rates and growing input costs, Hyderabad-based Nagarjuna Construction Company Limited (NCCL) is planning to emerge as a key player in this segment over the next two to three years.
NCCL, through its wholly-owned subsidiary NCC Infrastructure Holdings Limited (NCC Infra), intends to take up about 15 new BOT projects in a couple of years involving an investment of about Rs 15,000 crore.
At present, the company is executing 10 BOT projects worth about Rs 7,000 crore in sectors such as roads, power, airports and seaports.
Keeping in view the long-term requirements, NCC Infra will also expand its equity base from the existing Rs 200 crore to Rs 500 crore in the next 18 months and to Rs 3,000 crore in a span of 10 years, NCCL managing director, A Ranga Raju, told Business Standard.
NCC Infra’s current BOT projects include the Rs 1,600-crore Vajra Seaport at Machilipatnam in Andhra Pradesh, Rs 1,450 crore 280 Mw hydro power project in Sikkim, Rs 580 crore hydro power project in Himachal Pradesh, Rs 580 crore Meerut-Muzaffarpur road project in Uttar Pradesh, Rs 248 crore Bangalore-Maddur state highway project and Rs 100-crore each airport projects at Shimoga and Gulbarga in Karnataka.
The all-weather deep water port at Machilipatnam is being developed by the company in consortium with Maytas Infra, SREI Infrastructure Finance Limited and Sarat Chatterjee and Company Limited. Raju said the project was expected to achieve financial closure by December this year and work would commence from March 2009.
On the other hand, the construction of the power project in Himachal Pradesh has commenced and is expected to be completed by 2011. With regard to the Sikkim power project, a detailed project report (DPR) is being finalised. The development agreements of Shimoga and Gulbarga airports have been signed and the DPRs are being prepared.
The company is also looking towards setting up thermal power projects. It is exploring the possibility of acquiring coal mines in Indonesia for securing the necessary coal linkages in this regard.
To focus on the realty sector, NCCL has incorporated another subsidiary – NCC Urban Infrastructure Limited – which is all set to deliver 12.8 million sft of built-up space spread over 286 acres by 2011.
Besides executing the 50-acre National Games Housing Complex project at Ranchi in Jharkhand, NCC Urban has acquired lands to an extent of 540 acres in Hyderabad, Bangalore, Kakinada, Lucknow, Raipur and Visakhapatnam for its real estate projects.
This apart, NCCL is developing a 400-acre integrated township at Tellapur here along with Tishman Spears of New York, and ICICI Ventures as equity partners.
NCCL has a stake of 26 per cent in the Rs 1,600 crore project, while 37 per cent each is held by Tishman Spears and ICICI Ventures. On a fully developed basis, it has been planned to develop 30 million sft, spread over a period of 7 years. In the first phase, about 167 acres would be developed.
“We have submitted the DPR and are planning to launch the project by March next year. We have paid Rs 440 crore towards 25 per cent of the cost of the land to the Hyderabad Urban Development Authority and the second installment of an equal amount will be paid next month,” Raju said.
On the international front, NCCL is focusing on expanding its share in the booming construction business in the UAE, Sultanate of Oman and other countries in West Asia. At present, the company’s international division has an order book of Rs 2,425 crore comprising road projects, water pipelines and infrastructure projects.
According to Raju, NCCL’s consolidated turnover this year is expected to be Rs 5,000 crore as against Rs 3,478 crore last year. However, the operating profit margin, which stood at 10.4 per cent last year, is likely to decline to 10 per cent and below in the current year. In the first quarter of the current financial year, its operating profit margin was 9.4 per cent.
Nagarjuna Construction to take up more BOT projects
Posted by :
coolmaddyTracked by: 0 Boarder
At a time when many infrastructure companies are not being aggressive in undertaking build, operate and transfer (BOT) projects in the light of rising interest rates and growing input costs, Hyderabad-based Nagarjuna Construction Company Limited (NCCL) is planning to emerge as a key player in this segment over the next two to three years.
NCCL, through its wholly-owned subsidiary NCC Infrastructure Holdings Limited (NCC Infra), intends to take up about 15 new BOT projects in a couple of years involving an investment of about Rs 15,000 crore.
At present, the company is executing 10 BOT projects worth about Rs 7,000 crore in sectors such as roads, power, airports and seaports.
Keeping in view the long-term requirements, NCC Infra will also expand its equity base from the existing Rs 200 crore to Rs 500 crore in the next 18 months and to Rs 3,000 crore in a span of 10 years, NCCL managing director, A Ranga Raju, told Business Standard.
NCC Infra’s current BOT projects include the Rs 1,600-crore Vajra Seaport at Machilipatnam in Andhra Pradesh, Rs 1,450 crore 280 Mw hydro power project in Sikkim, Rs 580 crore hydro power project in Himachal Pradesh, Rs 580 crore Meerut-Muzaffarpur road project in Uttar Pradesh, Rs 248 crore Bangalore-Maddur state highway project and Rs 100-crore each airport projects at Shimoga and Gulbarga in Karnataka.
The all-weather deep water port at Machilipatnam is being developed by the company in consortium with Maytas Infra, SREI Infrastructure Finance Limited and Sarat Chatterjee and Company Limited. Raju said the project was expected to achieve financial closure by December this year and work would commence from March 2009.
On the other hand, the construction of the power project in Himachal Pradesh has commenced and is expected to be completed by 2011. With regard to the Sikkim power project, a detailed project report (DPR) is being finalised. The development agreements of Shimoga and Gulbarga airports have been signed and the DPRs are being prepared.
The company is also looking towards setting up thermal power projects. It is exploring the possibility of acquiring coal mines in Indonesia for securing the necessary coal linkages in this regard.
To focus on the realty sector, NCCL has incorporated another subsidiary – NCC Urban Infrastructure Limited – which is all set to deliver 12.8 million sft of built-up space spread over 286 acres by 2011.
Besides executing the 50-acre National Games Housing Complex project at Ranchi in Jharkhand, NCC Urban has acquired lands to an extent of 540 acres in Hyderabad, Bangalore, Kakinada, Lucknow, Raipur and Visakhapatnam for its real estate projects.
This apart, NCCL is developing a 400-acre integrated township at Tellapur here along with Tishman Spears of New York, and ICICI Ventures as equity partners.
NCCL has a stake of 26 per cent in the Rs 1,600 crore project, while 37 per cent each is held by Tishman Spears and ICICI Ventures. On a fully developed basis, it has been planned to develop 30 million sft, spread over a period of 7 years. In the first phase, about 167 acres would be developed.
“We have submitted the DPR and are planning to launch the project by March next year. We have paid Rs 440 crore towards 25 per cent of the cost of the land to the Hyderabad Urban Development Authority and the second installment of an equal amount will be paid next month,” Raju said.
On the international front, NCCL is focusing on expanding its share in the booming construction business in the UAE, Sultanate of Oman and other countries in West Asia. At present, the company’s international division has an order book of Rs 2,425 crore comprising road projects, water pipelines and infrastructure projects.
According to Raju, NCCL’s consolidated turnover this year is expected to be Rs 5,000 crore as against Rs 3,478 crore last year. However, the operating profit margin, which stood at 10.4 per cent last year, is likely to decline to 10 per cent and below in the current year. In the first quarter of the current financial year, its operating profit margin was 9.4 per cent.
...
Nagarjuna Const bags 3 orders; stock down
Posted by :
souravkunduTracked by: 0 Boarder
Dear guest... we all are trying to answer that questions since the last 4-5 years..
regards sourav...
In reply to:
Nagarjuna Const bags 3 orders; stock down
Posted by :
Guest
why is the value os this stock down even after bagging order worth approx 450 crore. couldnt understand the rationale behind this. could any1 xplain dat.
Nagarjuna Const bags 3 orders; stock down
Posted by :
GuestTracked by: 0 Boarder
why is the value os this stock down even after bagging order worth approx 450 crore. couldnt understand the rationale behind this. could any1 xplain dat....
In reply to:
Nagarjuna Const bags 3 orders; stock down
Posted by :
MMB Messenger
At 1:42 pm, Nagarjuna Construction Co. was quoting at Rs 124.30, down Rs 1.5, or 1.19%. It has touched an intraday high of Rs 126.65 and an intraday low of Rs 123.50. The company has bagged 3 orders worth Rs 474 crore, reports CNBC-TV18. It was trading with volumes of 387,242 shares.
Nagarjuna Const bags 3 orders; stock down
Posted by :
GuestTracked by: 0 Boarder
it\\\\\\\\`s management is good. fundamentals are also good. buy at current level for a long term. it will give good return....
In reply to:
Nagarjuna Const bags 3 orders; stock down
Posted by :
MMB Messenger
At 1:42 pm, Nagarjuna Construction Co. was quoting at Rs 124.30, down Rs 1.5, or 1.19%. It has touched an intraday high of Rs 126.65 and an intraday low of Rs 123.50. The company has bagged 3 orders worth Rs 474 crore, reports CNBC-TV18. It was trading with volumes of 387,242 shares.
Nagarjuna Const bags 3 orders; stock down
Posted by :
MMB MessengerTracked by: 0 Boarder
At 1:42 pm, Nagarjuna Construction Co. was quoting at Rs 124.30, down Rs 1.5, or 1.19%. It has touched an intraday high of Rs 126.65 and an intraday low of Rs 123.50. The company has bagged 3 orders worth Rs 474 crore, reports CNBC-TV18. It was trading with volumes of 387,242 shares.
...
Nagarjuna Constructions gets 474cr order
Posted by :
coolmaddyTracked by: 0 Boarder
Source: NSE - Nagarjuna Construction Co. Ltd has informed the Exchange that the company has secured three new orders aggregating Rs.474 crores. In this connection company has submitted to the Exchange a press release dated August 21, 2008. A copy of the same shall be available on the NSE website (http://www.nseindia.com) under: Corporates > Latest Announcements and on the Extranet Server (/Common/Corporate Announcements). Date: 2008-08-21...
Nagarjuna Constructions secures 474cr Order
Posted by :
coolmaddyTracked by: 0 Boarder
Nagarjuna Construction Company Ltd announced that it has secured three new orders aggregating INR 474 crores.
Nagarjuna Construction in a statement said that it has received first order worth INR 252 crore from Engineers India Ltd, New Delhi for development of Sports Facilities & Associated Infrastructure Development works for Common Wealth Games 2010, New Delhi. The work is to be completed in a period of 18 months.
The second order worth INR 114 crore is from the Executive Engineer, Bangalore Metropolitan Transport Corporation, Bangalore for the construction of Traffic and Transit Management Center under JNNURM scheme. The work is to be completed in a period of 24 months.
The third order worth INR 108 crore is received from the Executive Engineer, KSRTC Civil Engineering Division, Mysore for the Development of Transport Infrastructure Facilities for Mysore under JNNURM scheme. The work is to be completed in a period of 18 months....
buy it now...
Posted by :
mj_smartinvestTracked by: 0 Boarder
TO all indian investor i request to buy
Nagarjuna Construction Co. (BSE: 500294 | NSE: NAGARCONST) at 120-123 lavels for three(3years) prospective for tgt of 670-780 rs.not 2 worri bcus our big b in this stock.As i invested in it at 126 n i m trying to invest in it all down side.www moneymakerindia.741 com ...
Nagarjuna Construction bags three new orders worth Rs 474 crore
Posted by :
KJPTracked by: 1 Boarder
I think good time ahead for Nagarjuna Constructions. CMP looks very attractive and can easily gain 20-25% in short term. The only hindrance is the prevailing dull phase in Infra Sector, which can change any time....
In reply to:
Nagarjuna Construction bags three new orders worth Rs 474 crore
Posted by :
zoombusiness
Hyderabad-based infrastructure major Nagarjuna Construction (NCCL) has bagged three orders worth Rs 474 crore. The first order valued at Rs 252 crore has been secured from Engineers India for development of sports facilities and associated infrastructure development work for Commonwealth Games-2010 at North Campus, Delhi University
The project will be completed over a period of 18 months. The second order is from Bangalore Metropolitan Transport Corporation for the construction of Traffic and Transit Management Centre under the Jawaharlal Nehru National Urban Renewal Mission (JNNURM) scheme. It is valued at Rs 114 crore and is expected to be completed within 24 months.
The third order worth Rs 108 crore is from KSRTC civil engineering division Mysore for the development of transport infrastructure facilities
2 queries on Nagarjuna Const

More from the Construction & Contracting - Civil Sector
Boarders tracking Nagarjuna Const
see more News Updates on Nagarjuna Const







Offline